What inspections are required during construction?
  • Basement plumbing ground rough (floor drain, basement bathroom, etc., if applicable)
  • Building sewer tap (yard trap, schedule 40 4-inch pipe required, if applicable)
  • Building water tap inspection
  • Concrete foundation wall inspection
  • Footing inspection
  • Framing, electric, and plumbing rough (open wall inspection prior to insulating - inspected at the same time)
  • Temporary / permanent electric (meter base, panel board, if applicable)
  • Final Inspection (Occupancy Permit Issued): 24-hour notice is required prior to inspections. Please call 636-937-6646 to schedule an appointment.

Show All Answers

1. What do I need to get a building permit?
2. What inspections are required during construction?
3. When is a Certificate of Occupancy required?
4. What are the deck or porch installation requirements?
5. Do I need a permit to build a fence? What are the requirements?
6. What are the requirements for pool installation?
7. What are the requirements for roof ice & water shield?